1300 BLOOR ST: CONDOMINIUM EBCx CHILLER COMMISSIONG PROJECT

The goal of the project carried out at Applewood Landmark, 1300 Bloor St. was to optimize and recommission the condominium’s existing Chilled Water System. Through the implementation of Energy Efficiency Measures related to the two (2) 450 ton Trane Chillers, 31% energy consumption savings and 48% electricity demand savings were achieved.

Continue Reading1300 BLOOR ST: CONDOMINIUM EBCx CHILLER COMMISSIONG PROJECT

MOHAWK COLLEGE: INSTITUTIONAL AHU BIOSCRUB PROJECT WITH M&V

A Measurement and Verification analysis was performed on 3 AHUs serving the administration, theatre and common spaces of the Campus C-Wing located at 135 Fennell Ave. W., Hamilton, Ontario. The purpose of the analysis was to baseline the AHUs pre BioScrub Coil cleaning and validate the benefits of the BioScrub post cleaning that was performed in June, 2018.

Continue ReadingMOHAWK COLLEGE: INSTITUTIONAL AHU BIOSCRUB PROJECT WITH M&V

JW MARRIOT: MUSKOKA RESORT ENHANCED ENERGY AUDIT PROJECT

A detailed Energy Audit at the JW Marriott – The Rosseau Resort & Spa was performed to identify where and how the Resort could save energy and overhead costs. With the implementation of Energy Management Opportunities (EMOs) it was estimated that the Resort would save approximately $550,000/year and have the average simple payback of 2.99 years.

Continue ReadingJW MARRIOT: MUSKOKA RESORT ENHANCED ENERGY AUDIT PROJECT